Guest Writer

Powering Industry Directly: How Wheeled Solar and Storage Reach Financial Close in South Africa

For South African miners, smelters and manufacturers, electricity is both the largest controllable cost and the largest source of operational risk. Rising grid tariffs, supply interruptions and carbon-border pressure from export markets are pushing heavy users to look for power they can contract directly.

At African Earth Energy Group (AEEG), we are building a project for exactly that buyer: a proposed 49 MW solar PV and battery storage plant near Middelburg in Mpumalanga, in an industrial corridor close to a major smelter. Site assessments, grid planning and stakeholder engagement are complete, and we are now seeking an anchor industrial off-taker.

Here is how a project like this works, and what it takes to get from first conversation to financial close.

Solar PV and battery storage site in the South African Highveld with transmission lines in the distance

What industrial buyers gain from wheeled or direct supply

In a wheeled arrangement, power generated at our solar farm travels through the national grid to the customer's own meter, and the customer pays a network charge for that use. In a direct or on-site arrangement, the plant supplies the customer without crossing the public network. Either way, the buyer signs a long-term power purchase agreement (PPA) with the developer rather than buying equipment.

For the buyer, that brings four things:

  • Price certainty. A PPA fixes the price of a large share of consumption for years, instead of leaving it to annual tariff increases.

  • No capital outlay. The developer finances, builds and operates the plant, so the buyer's balance sheet is spared and its capital stays in the core business.

  • Scale. A utility-scale plant can cover loads that rooftop solar cannot, which matters for smelters and mines running around the clock.

  • Credible emissions cuts. Contracted renewable supply gives export-facing companies verifiable reductions in the electricity emissions they report to customers and regulators.

Why battery storage makes the supply dependable

Solar produces when the sun shines, but a smelter or mine consumes around the clock. Battery storage closes that gap in three ways.

  • Shifting energy. The battery charges at midday and discharges into the evening, so more of the customer's demand is met by contracted renewable power rather than the grid.

  • Smoothing output. Storage evens out the swings caused by passing cloud, giving the customer steadier power and giving the network operator a more predictable generator.

  • Adding resilience. Where the site is designed for it, stored energy can help carry critical loads through a grid disturbance.

Storage also strengthens the project's finances. A plant that delivers firmer, more predictable power is easier to contract and easier for lenders to assess.

From off-take to financial close

Lenders finance contracts, not sunshine, so the off-taker sits at the centre of the process. Our pipeline follows the same sequence on every project:

  1. Secure the site and the grid. We start with the landowner, confirm the solar resource and test the connection point and network capacity before committing further.

  2. Agree the off-take. The anchor customer and AEEG agree a term sheet on volume, price, contract length and how supply is delivered, then convert it into a PPA.

  3. Settle the wheeling arrangements. Where power crosses the grid, we work with the network operator on the connection agreement and the wheeling terms.

  4. Complete permits and design. Environmental authorisations, regulatory registration, land agreements and the technical design of the solar and storage plant are finalised.

  5. Lock in construction terms. Fixed-price construction and equipment contracts, including the battery supplier's performance guarantees, give lenders cost and delivery certainty.

  6. Bring in capital. Investors and lenders run technical, legal and financial due diligence. When the conditions precedent are met, we reach financial close and construction begins.

The order matters. Land, grid and capital must line up together, and a gap in any one stalls the project. That is why we test land and grid first and bring in capital once both hold.


About African Earth Energy Group

African Earth Energy Group is a B-BBEE Level 2 developer of utility-scale solar and battery storage in South Africa, founded and led by Karen Metcalf. We develop, finance and operate projects from the Highveld to the Karoo, working with landowners, communities and investors, and supply mining, industrial and commercial customers through wheeled and on-site structures. Our pipeline is approximately 1 GW, led by the 49 MW Middelburg project in Mpumalanga.